Ontario government to install charging stations.

  • If you haven't taken delivery yet or plan on ordering you can still get the 6 months of FREE Supercharging only until December 17th all Model 3s now qualify! Call or email your Tesla delivery advisor and give them our code
  • Winter is here and the forum is starting to get flooded with cold weather threads and posts. Please heed the suggested threads and posts before you post something related to cold weather. This is a great place to start: https://model3ownersclub.com/threads/teslas-in-cold-weather.5271

TrevP

M3OC Founder / Administrator
Founder
Joined
Mar 1, 2016
Messages
6,038
Location
Aurora,Ontario
Tesla Owner
Model X
Country
Country
#2
Yes, this was announced when they revamped the EVIP program on February 10th. Keep in mind, these are level 2 and some level 3 chargers. Tesla will still deploy their own Superchargers and destination chargers so the more the merrier ;)
 

Blackout

Active Member
Joined
Apr 24, 2016
Messages
146
Location
Toronto, ON
Country
Country
#3
Yes, this was announced when they revamped the EVIP program on February 10th. Keep in mind, these are level 2 and some level 3 chargers. Tesla will still deploy their own Superchargers and destination chargers so the more the merrier ;)
Does Tesla install there own proprietary charger at destination? Or is it like a standard level 2 charger available for other cars?
 

TrevP

M3OC Founder / Administrator
Founder
Joined
Mar 1, 2016
Messages
6,038
Location
Aurora,Ontario
Tesla Owner
Model X
Country
Country
#4
Does Tesla install there own proprietary charger at destination? Or is it like a standard level 2 charger available for other cars?
Teslas destination chargers are their own high powered wall connectors. They are level 2 but only work for Model S X and Model 3
 

Thalass

Active Member
Joined
Apr 10, 2016
Messages
51
Location
Ontario, Canada
#6
I would be surprised if there wasn't eventually a Tesla to J1772 or Chademo adapter available, so that Leafs (leaves?) and Bolts etc can use Tesla infrastructure.
 
Joined
Jul 2, 2016
Messages
9
Location
Niagara Falls, CANADA
#8
These charger stations are supposed to be in place by March 31 of 2017. Has anyone heard of any of them being installed yet? I could visit the Fort Erie, Niagara Falls and St. Catharines locations to see if there're any plans for their installation.